Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
Page 10
Page 11
Page 12
Page 13
Page 14
Page 15
Page 16
Page 17
Page 18
Page 19
Page 20
Page 21
Page 22
Page 23
Page 24
Page 25
Page 26
Page 27
Page 28
Page 29
Page 30
Page 31
Page 32
Page 33
Page 34
Page 35
Page 36
Page 37
Page 38
Page 39
Page 40
Page 41
Page 42
Page 43
Page 44
Page 45
Page 46
Page 47
Page 48
Page 49
Page 50
Grunley replaced and updated the exterior faade of this commercial office build- ing. The existing building is a six-story office building. The building was constructed in 1979 and had minor repairs and renovations done previously. The Owner wished to elevate the architectural presence of the building with the tenants still in the building. The design goals were to create a new contemporary image for the building and el- evate the character of this office building without interrupting the day to day opera- tions of the tenants. Grunley createdswingspace for the tenants. The temporary space included usable office layouts phone service data lines temporary heat and finishes to match existing. Demolition and construction ofswingspace was performed at off-hours to insure there was no work day interruption to the tenants. On a daily basis the project superintendent worked with the Owner and tenants to ensure minimal interruption to daily activities. 8315 LEE HIGHWAY FAADE RESTORATION Merrifield VA OWNER CJC Associates Limited Partnership DATE OF AWARD September 2008 COMPLETION DATE August 2009 CONTRACT AMOUNT 4.8M ARCHITECT Davis Carter Scott Ltd.