Brazilian Embassy
Brazilian Embassy
Partial Renovation
Grunley was the prime contractor for the renovation of the Chancery Building. The building was constructed in 1971. The scope of work included abatement and select mold remediation, replacement of the existing HVAC and lighting systems, installation of a wet-pipe sprinkler system, replacement of the built-up roofing system, flooring and ceiling.
Project Details
Client:Embassy of Brazil
Location:Washington, D.C.
Sector:Embassy
Contract TypeRenovation
Completion DateJune 15, 2011
Amount$6 million
Contract MethodGeneral Contracting
Architect GHT Chartered