TSA Operational Testing Facility
TSA Operational Testing Facility
Interior Build-Out
This 130,000 square foot design-build project was performed within an existing post office building. It required gutting the existing offices, demolishing mezzanine space and structure and constructing new office space, along with a two-story open bay space for baggage handling testing systems infrastructure. The tenant is the Transportation Security Agency (TSA). The work included two garage areas with loading docks for vehicles to access the facility and transport the baggage screening systems infrastructure. Grunley was the construction contractor for the baggage handling system design-build integrator, Vic Thompson Company.
Project Details
Client:Metropolitan Washington Airports Authority & U.S. Department of Homeland Security
Location:Washington, D.C.
Sectors:Industrial/Manufacturing, Transportation/Aviation
Contract TypeRestoration
Completion DateDecember 1, 2009
Amount$8 million
Contract MethodGeneral Contracting
Architect Michael Winstanley Architect Planners